AI in infancy period. Early Adopters Win. The Best Practice to Profit from this Explosion Explained.
Future Energy Drives AI. No other metal compares to Silver for connectivity and conductivity.
There is No Substitute for Silver
Obtain Leverage to The World’s Most Undervalued Commodity
For Silver leveraged we recommend:
1. Andean Precious Metals
2. Dolly Varden Silver
3. Kuya Silver
4. Outcrop Silver
The Best Practice to Profit from this Explosion Explained.
Silver Powered Energy.
If you believe that AI is just getting started and you want the Best Practice to Profit from this Technology Explosion then understand that it’s all Powered by Silver the Worlds Top Conductor of Electricity
When we talk about Batteries, and Electricity, (Translation,) WE MEAN SILVER
The relentless growth of data centers to power advanced AI systems and maintain 24/7 internet and mobile services is driving a booming business for manufacturers of generators and battery backup systems. These components ensure an uninterrupted power supply during outages and grid disruptions, which is crucial for AI and digital services that require continuous operation.
Power Demand Surge
AI innovations like ChatGPT require significantly more electricity compared to traditional computing tasks like web searches. For instance, a single ChatGPT query consumes 2.9 watt-hours, nearly 10 times more than a Google search. This increased power demand from AI is expected to drive a 160% increase in data center electricity consumption by 2030, representing around 19% of total data center power demand.
Emissions and Infrastructure Challenges
The anticipated rise in data center power consumption will lead to a substantial increase in carbon dioxide emissions, estimated to cost $125-140 billion in social costs by 2028. Tech companies are investing in renewable energy and emerging nuclear technologies to mitigate emissions, but the surge in demand is straining existing infrastructure.
U.S. utilities will need to invest around $50 billion in new generation capacity solely to support data centers, and incremental data center power consumption is expected to drive a significant portion of the projected 2.4% increase in U.S. power demand between 2022 and 2030.
Challenges for Utilities
Utilities are facing challenges in keeping up with the rapid growth of data centers, which can be approved and built within 18-24 months, while new transmission lines can take a decade to approve. Grid-enhancing technologies and a range of new generating sources, including solar, wind, natural gas, and small modular nuclear reactors, are being explored to meet the increasing demand.
The surge in electricity demand from AI and other electrification efforts is raising concerns about meeting emissions reduction goals, as utilities may need to rely more on fossil fuel-powered plants in the near term to ensure reliable baseload power.